CSR Consultant Rainwater harvest method

RAIN WATER HARVESTING

STP / WASTE WATER TREATMENT PLANT SETUP / NEW CONSTRUCTION

PMC Services

CSR Consultants Rainwater harvesting

SOLAR PANEL INSTALLATION FOR ENERGY SAVING

STEP-2:   Feasibility Study report

1. Total Plot area
2. Total occupation of carpet areas and builtup areas. Check

    cluster development.
‚Äč3. As per new
DCR 2034 rule, calculate the potential of the

    plot for redevelopment.
4. Evaluate the Road plan and fungible FSI and TDR costs

    for specific areas.
5. Generate the total builtup area report as per the potential

     along with construction cost and other charges.
6. Prepare a consolidated report as Project Feasibility report

    for Redevelopment of said plot

CSR Consultants initiate Society with Energy saving
  • Planning and Scheduling of job
  • Providing milestone for various job
  • Provide Full time Engineers for supervising Work in progress
  • Schedule periodic meetings with Stake holder and update the progress
  • Documentation and Non Destructive Testing (NDT)
  • Bill Verification and Inform for deviations for improvements
CSR Consultants introduces Solar panels to Society

STEP-1:   Basic Documentation Required


1. Conveyance deed
2. Society Registration Certificate
3. General Body Resolution to go for redevelopment.

4. List of member with their respective carpet areas

5. C.T.S. plan & property card for the plot.
6. D.P. remarks, If the property is under TPS scheme then T.P. remarks

7. Copy of municipal approval plans

REDEVELOPMENT OF SOCIETIES   I   FEASIBILITY STUDY   I   PMC

REDEVELOPMENT PROJECT FEASIBILITY REPORT

 CSR Consultant & Associates

For Building Repair +91 9323547766